- Support Services
- Elaine E.Thompson Elementary School (ES-23)
Construction Services
- Overview
- Under Construction
- Lightridge High School (HS-9)
- Elaine E.Thompson Elementary School (ES-23)
- Hovatter Elementary School (ES-29)
- The North Star School
- Douglass School Renovations
- Bidding and Prequalification
- Contract Awards
- Current Solicitations
- Project Management Team
- Design Team
- Two-Story Architect Renderings
- Photo of the Month
- Facility Assessment Studies
- COAA Leadership Award
- Environmental Preservation Award
- Completed Projects
- Adopted CIP Documents
- Directions to LCPS Construction Office
- Sustainability Efforts
-
Elaine E. Thompson Elementary School -- Opened Fall 2022
24200 Pissarro Drive, Sterling, VA 20166
LCPS Senior Project Manager: Scott Klose
LCPS Project Manager: Anil KumarContractor: Howard Shockey & Sons, Inc., Winchester, VA
Architect: Stantec, Arlington, VA
Civil Engineer: Bowman Consulting, Leesburg, VACIP Funding - FY2020
Construction Began – Summer of 2020
Project Completion – Summer/Fall 2021Elaine E. Thompson Elementary School (ES-23) received funding in fiscal year 2020 and will open at the start of the 2022-2023 academic year. The elementary school will be built using a design prototype. The approximate 113,600 square foot building will serve students in kindergarten through grade five.
With an anticipated program capacity of 960 students, the elementary school will include classrooms, a media center, a cafeteria, multipurpose room and two unlighted outdoor physical education fields.
Elaine E. Thompson School will be located on 24200 Pissaro Drive in Sterling, Virginia - within the Arcola Center development.Due to heavy equipment operations and construction vehicles, all drivers should be aware of new traffic patterns and alternate routes near the property. As this is an active construction site, access is controlled and requires permission from the LCPS Division of Construction Services.
If you have questions regarding the project or after-hours work at this site, please contact the Office of Construction Services at (571) 252-1161.June Drone Video - last drone footage for this school
C l i c k o n t h e " i " f o r c a p t i o n sNovember 2021