• Brambleton Middle School -- Opening Fall 2017

     

    LCPS Senior Project Manager: Scott Klose
    LCPS Project Manager: Roy Grandstaff

    Contractor: Howard Shockey & Sons, Winchester, VA
    Architect: MTFA Architecture, Arlington VA
    Civil Engineer: Urban Ltd., Annandale, VA

     

    CIP Funding - FY2016
    Construction Began – Fall of 2015
    Project Completion – Summer 2017

     

    Brambleton Middle School received funding in Fiscal Year 2015, and will open at the start of the 2017-18 academic year. The middle school is being built using a new prototypical two-story middle school design. The estimated 184,593 square-foot building will serve students in grades six through eight.

    With an anticipated program capacity of 1,350, the middle school design will utilize the “house” concept for each grade and will include classrooms, a media center, cafeteria, auditorium, gymnasium, auxiliary gymnasium and three unlighted outdoor physical education fields.

    Brambleton Middle School is sited on a proffered site adjacent to the Brambleton development at 23070 Learning Circle, Ashburn, and co-located with HS-11 (Dulles North Planning District).

    Due to heavy equipment operations and construction vehicles, all drivers should be aware of new traffic patterns and alternate routes near the property. As this is an active construction site, access is controlled and requires permission from the LCPS Division of Construction Services.

    If you have questions regarding the project or after-hours work at this site, please contact the Office of Construction Services at (571) 252-1161.



    Click here to see drone video dated 9/3/2017.

    Click here for past images.

    C l i c k   o n   t h e   " i "   f o r   c a p t i o n s .

    June 2017